{"id":2937,"date":"2016-03-13T14:57:09","date_gmt":"2016-03-13T14:57:09","guid":{"rendered":"http:\/\/southpelawjunction.co.uk\/wp\/?page_id=2937"},"modified":"2018-03-14T10:56:13","modified_gmt":"2018-03-14T10:56:13","slug":"diesel-locomotives","status":"publish","type":"page","link":"https:\/\/southpelawjunction.co.uk\/wp\/?page_id=2937","title":{"rendered":"Diesel Locomotives"},"content":{"rendered":"<p>A look at some of the diesel locomotives that appeared on the line.<\/p>\n<p><span style=\"color: #003366;\"><strong>Introduction of Dieselisation<\/strong><\/span><\/p>\n<figure id=\"attachment_852\" aria-describedby=\"caption-attachment-852\" style=\"width: 299px\" class=\"wp-caption alignright\"><a href=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2014\/03\/24andclaytons-@southpelaw1.jpg\" rel=\"attachment wp-att-852\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-852\" src=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2014\/03\/24andclaytons-@southpelaw1-1024x615.jpg\" alt=\"24andclaytons @southpelaw1\" width=\"299\" height=\"180\" srcset=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2014\/03\/24andclaytons-@southpelaw1-1024x615.jpg 1024w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2014\/03\/24andclaytons-@southpelaw1-300x180.jpg 300w\" sizes=\"auto, (max-width: 299px) 100vw, 299px\" \/><\/a><figcaption id=\"caption-attachment-852\" class=\"wp-caption-text\">One of Tyne Docks\u2019 Sulzer Type 2s approaching South Pelaw from the main line via Ouston Junction on an ore train for Consett and being banked, unusually, by two Type 2 Clayton Class 17s, a practice which proved unworkable with the result that two Class 24s were, ultimately, used to double head the trains. Photo copyright Bill Watson<\/figcaption><\/figure>\n<p>As early as 28th September 1962, tests began on diesel haulage of the iron ore trains. \u00a0BR\/Sulzer Type 4 No. 171 (later Class 46 46034) hauled a fully loaded, 800 ton, nine wagon train from Tyne Dock to Consett without a banker being used. \u00a0The air equipment on the locomotive was modified to allow for the operation of the hopper doors at Consett and the working was, by all accounts, a successful one with the journey taking 78 minutes rather than the normal 104 minutes.<\/p>\n<p>Further diesel trials took place in September 1963 when two Clayton (later Class 17) locomotives D8500 and D8501 were trialled on the ore trains. \u00a0D8536 replaced D8500 but the trials were unsuccessful as the locomotives proved to be too underpowered to handle the weight of the trains.<\/p>\n<p>The Claytons were also used, at least once, at the rear of a train hauled by a single Type 2 (later Class 24) as shown in the photograph on the right:<\/p>\n<p>By December 1964, Sulzer Type 4 (later Class 40) locomotives, based at Tyne Yard, had taken over the duty of banking engine from South Pelaw to Annfield Plain.<\/p>\n<p><span style=\"color: #003366;\"><strong>Type 2 (later Class 24)<\/strong><\/span><\/p>\n<p>During the summer of 1966, the Type 2 diesels started taking over the iron ore workings and August 1966 saw a number of unusual workings. \u00a0D5149 was seen on the 15th at Consett with a train of nine empty ore wagons and a brake van. \u00a0D511 was spotted with a single coach (possibly an inspection coach) on the 24th and on the 26th D5179 was seen on a loaded iron ore train at Stanley operating singly albeit with Type 4 D227 banking.<\/p>\n<p>Following the retirement of the 9Fs, ten Gateshead based Type 2s (D5102-D5111) were modified specifically to operate the iron ore trains. \u00a0The modifications involved\u00a0the removal of their train heating boilers and water tanks and receiving the necessary compressors and pipework to operate the wagon doors, the work taking place at Crewe and, possibly, Derby works.<\/p>\n<p>The locomotives were designed to run in pairs which, due to the length of the trains would require them to reverse on to the unloading gantry at Consett.<\/p>\n<figure id=\"attachment_2943\" aria-describedby=\"caption-attachment-2943\" style=\"width: 3167px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5103-1972-Derby-Works-Fitted-for-Consett-iron-ore-traffic-Tony-ZF-4806-60506-1-004.jpg\" rel=\"attachment wp-att-2943\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2943 size-full\" src=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5103-1972-Derby-Works-Fitted-for-Consett-iron-ore-traffic-Tony-ZF-4806-60506-1-004.jpg\" alt=\"Type 2 5103 at Derby Works showing the additional air pipe for the Consett Iron Ore traffic.\" width=\"3167\" height=\"2152\" srcset=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5103-1972-Derby-Works-Fitted-for-Consett-iron-ore-traffic-Tony-ZF-4806-60506-1-004.jpg 3167w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5103-1972-Derby-Works-Fitted-for-Consett-iron-ore-traffic-Tony-ZF-4806-60506-1-004-300x204.jpg 300w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5103-1972-Derby-Works-Fitted-for-Consett-iron-ore-traffic-Tony-ZF-4806-60506-1-004-768x522.jpg 768w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5103-1972-Derby-Works-Fitted-for-Consett-iron-ore-traffic-Tony-ZF-4806-60506-1-004-1024x696.jpg 1024w\" sizes=\"auto, (max-width: 3167px) 100vw, 3167px\" \/><\/a><figcaption id=\"caption-attachment-2943\" class=\"wp-caption-text\">Type 2 5103 at Derby Works showing the additional air pipe for the Consett Iron Ore traffic. Photo copyright <a href=\"http:\/\/www.rail-online.co.uk\/\" target=\"_blank\">Rail-Online<\/a><\/figcaption><\/figure>\n<figure id=\"attachment_2946\" aria-describedby=\"caption-attachment-2946\" style=\"width: 1693px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5103-19670402-Gateshead-Consett-fitted-ZF-4806-60506-1-007.jpg\" rel=\"attachment wp-att-2946\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2946 size-full\" src=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5103-19670402-Gateshead-Consett-fitted-ZF-4806-60506-1-007.jpg\" alt=\"D5103 at Gateshead on 2 April 1967.\" width=\"1693\" height=\"1212\" srcset=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5103-19670402-Gateshead-Consett-fitted-ZF-4806-60506-1-007.jpg 1693w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5103-19670402-Gateshead-Consett-fitted-ZF-4806-60506-1-007-300x215.jpg 300w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5103-19670402-Gateshead-Consett-fitted-ZF-4806-60506-1-007-768x550.jpg 768w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5103-19670402-Gateshead-Consett-fitted-ZF-4806-60506-1-007-1024x733.jpg 1024w\" sizes=\"auto, (max-width: 1693px) 100vw, 1693px\" \/><\/a><figcaption id=\"caption-attachment-2946\" class=\"wp-caption-text\">D5103 at Gateshead on 2 April 1967. Photo copyright <a href=\"http:\/\/www.rail-online.co.uk\/\" target=\"_blank\">Rail-Online<\/a><\/figcaption><\/figure>\n<figure id=\"attachment_2947\" aria-describedby=\"caption-attachment-2947\" style=\"width: 1733px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5105-19670806-Gateshead-Consett-fitted-ZF-4806-60506-1-006.jpg\" rel=\"attachment wp-att-2947\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2947 size-full\" src=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5105-19670806-Gateshead-Consett-fitted-ZF-4806-60506-1-006.jpg\" alt=\"D5105 at Gateshead on 6 August 1967.\" width=\"1733\" height=\"1230\" srcset=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5105-19670806-Gateshead-Consett-fitted-ZF-4806-60506-1-006.jpg 1733w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5105-19670806-Gateshead-Consett-fitted-ZF-4806-60506-1-006-300x213.jpg 300w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5105-19670806-Gateshead-Consett-fitted-ZF-4806-60506-1-006-768x545.jpg 768w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5105-19670806-Gateshead-Consett-fitted-ZF-4806-60506-1-006-1024x727.jpg 1024w\" sizes=\"auto, (max-width: 1733px) 100vw, 1733px\" \/><\/a><figcaption id=\"caption-attachment-2947\" class=\"wp-caption-text\">D5105 at Gateshead on 6 August 1967. Photo copyright <a href=\"http:\/\/www.rail-online.co.uk\/\" target=\"_blank\">Rail-Online<\/a><\/figcaption><\/figure>\n<figure id=\"attachment_2948\" aria-describedby=\"caption-attachment-2948\" style=\"width: 1528px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5107-19661031-Wearmouth-Consett-fitted-ZF-4806-60506-1-005.jpg\" rel=\"attachment wp-att-2948\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2948 size-full\" src=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5107-19661031-Wearmouth-Consett-fitted-ZF-4806-60506-1-005.jpg\" alt=\"D5107 at Wearmouth on 31 January 1967.\" width=\"1528\" height=\"1215\" srcset=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5107-19661031-Wearmouth-Consett-fitted-ZF-4806-60506-1-005.jpg 1528w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5107-19661031-Wearmouth-Consett-fitted-ZF-4806-60506-1-005-300x239.jpg 300w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5107-19661031-Wearmouth-Consett-fitted-ZF-4806-60506-1-005-768x611.jpg 768w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/D5107-19661031-Wearmouth-Consett-fitted-ZF-4806-60506-1-005-1024x814.jpg 1024w\" sizes=\"auto, (max-width: 1528px) 100vw, 1528px\" \/><\/a><figcaption id=\"caption-attachment-2948\" class=\"wp-caption-text\">D5107 at Wearmouth on 31 January 1967. Photo copyright <a href=\"http:\/\/www.rail-online.co.uk\/\" target=\"_blank\">Rail-Online<\/a><\/figcaption><\/figure>\n<figure id=\"attachment_2944\" aria-describedby=\"caption-attachment-2944\" style=\"width: 7559px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5111_1973-08-10_is_it_really_Stratford_It_is_one_of_the_Consett_Iron_Ore_train_fitted_24s-ROneg-1308-314-ZF-9845-94957-1-001.jpg\" rel=\"attachment wp-att-2944\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2944 size-full\" src=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5111_1973-08-10_is_it_really_Stratford_It_is_one_of_the_Consett_Iron_Ore_train_fitted_24s-ROneg-1308-314-ZF-9845-94957-1-001.jpg\" alt=\"Type 2 51111 possibly at Stratford showing the additional air pipe for the Consett Iron Ore traffic.\" width=\"7559\" height=\"5485\" srcset=\"https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5111_1973-08-10_is_it_really_Stratford_It_is_one_of_the_Consett_Iron_Ore_train_fitted_24s-ROneg-1308-314-ZF-9845-94957-1-001.jpg 7559w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5111_1973-08-10_is_it_really_Stratford_It_is_one_of_the_Consett_Iron_Ore_train_fitted_24s-ROneg-1308-314-ZF-9845-94957-1-001-300x218.jpg 300w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5111_1973-08-10_is_it_really_Stratford_It_is_one_of_the_Consett_Iron_Ore_train_fitted_24s-ROneg-1308-314-ZF-9845-94957-1-001-768x557.jpg 768w, https:\/\/southpelawjunction.co.uk\/wp\/wp-content\/uploads\/2016\/03\/5111_1973-08-10_is_it_really_Stratford_It_is_one_of_the_Consett_Iron_Ore_train_fitted_24s-ROneg-1308-314-ZF-9845-94957-1-001-1024x743.jpg 1024w\" sizes=\"auto, (max-width: 7559px) 100vw, 7559px\" \/><\/a><figcaption id=\"caption-attachment-2944\" class=\"wp-caption-text\">Type 2 5111 possibly at Stratford showing the additional air pipe for the Consett Iron Ore traffic. Photo copyright <a href=\"http:\/\/www.rail-online.co.uk\/\" target=\"_blank\">Rail-Online<\/a><\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>A look at some of the diesel locomotives that appeared on the line. Introduction of Dieselisation As early as 28th September 1962, tests began on diesel haulage of the iron ore trains. \u00a0BR\/Sulzer Type 4 No. 171 (later Class 46 46034) hauled a fully loaded, 800 ton, nine wagon train from Tyne Dock to Consett&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-2937","page","type-page","status-publish","hentry"],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/P5O3LY-Ln","_links":{"self":[{"href":"https:\/\/southpelawjunction.co.uk\/wp\/index.php?rest_route=\/wp\/v2\/pages\/2937","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/southpelawjunction.co.uk\/wp\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/southpelawjunction.co.uk\/wp\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/southpelawjunction.co.uk\/wp\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/southpelawjunction.co.uk\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2937"}],"version-history":[{"count":12,"href":"https:\/\/southpelawjunction.co.uk\/wp\/index.php?rest_route=\/wp\/v2\/pages\/2937\/revisions"}],"predecessor-version":[{"id":4550,"href":"https:\/\/southpelawjunction.co.uk\/wp\/index.php?rest_route=\/wp\/v2\/pages\/2937\/revisions\/4550"}],"wp:attachment":[{"href":"https:\/\/southpelawjunction.co.uk\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}