New from John Stark, two 9Fs with empty and loaded iron ore trains meet under the bridge at the Washington end of South Pelaw Junction on 28 July 1965.
New from John Stark, two 9Fs with empty and loaded iron ore trains meet under the bridge at the Washington end of South Pelaw Junction on 28 July 1965.